lesson 4 feeders and outside branch circuits and feeders

lesson 4 feeders and outside branch circuits and feedersstonebrook neighborhood

April 10th, 2023 | Comments Off on lesson 4 feeders and outside branch circuits and feeders | most fragrant roses for southern california

What is the minimum number of 120-volt, 20-ampere lighting branch circuits needed for a 1,800-square-foot dwelling unit? All circuit conductors between the service equipment, the source of a separately derived system, or other power supply source and the final branch-circuit overcurrent device. Depending on the voltage, over 600 volts or below, we are limited to how small the conductor is that may be used for these spans. 220.14 (J) Unit load for dwelling units = 3 VA per ft.2 Lighting load = Area unit load = 16,000 3 VA per ft.2 = 48,000 VA 210.52 (B) and 220.52 (A) Small-appliance load = 2 1,500 VA = 3,000 VA 220.52 (B) There is one exception which is the use of a messenger wire, which normally utilizes some type of a steel cable or hybrid wire which has a center strand of steel; in this case, you do not have to increase conductor size when going over 50 feet. It feeds all the emergency lights for the stairs and other areas of the garage, but it also feeds the emergency power for the main building. Except if the overcurrent protection device and the feeder are rated for 100% use for continuous loads. Overhead spans of outside branch circuits and feeders installed using open multiconductor cables of not over 1,000 volts, nominal, are required to have a clearance of not less than ? The building/structure disconnecting means can consist of no more than six switches or six circuit breakers in a single enclosure or separate enclosures for each supply grouped in one location as permitted by 225.30 [225.33]. As feeders need other requirements to comply with compared to branch circuits and are quite common in buildings, planning the feeder along with the final overcurrent protection device will help prepare anyone interested to take on a project. These circuits are included in the feeder/service calculation at 1,500VA for each circuit [220.52(A)]. They would think that any pipe is more than enough , About Contact Privacy Policy Disclaimer. This feeds right into (C) which covers horizontal clearances, which also is 3 feet. Moving on to 225.11 through 16 we find requirements for conductor entrance and exit from buildings, open conductor supports, spacing, supports over buildings and attachment to buildings. Informational Note: For additional . 220.53 Appliance Load Dwelling Unit(s). The next clearances covered are those for the final span when it is near any windows, doors, porches, balconies, ladders, stairs, fire escapes, platforms, projections or similar surfaces from which the conductors may be reached, bunching all of these together as they require, again, a 3-foot clearance to conductors. A load where the MAXIMUM load is expected to last for 3 hours or more is said to be a: A branch circuit that consists of two or more ungrounded circuit conductors with a common neutral conductor. The disconnecting means could be located either outside or inside the building at a readily accessible point nearest the point of entrance of the conductors into the building. Recognizable as suitable for the specific purpose, function, use, environment, application, and so forth where described in a particular Code requirement defines ? Most of the violations happen in the clearances area. Please click the link in the banner above to update your browser. 2003-2023 Chegg Inc. All rights reserved. A disconnecting means is required for all conductors that enter a building or structure [225.31]. Often, these systems run over long distances and the current needed to have the overcurrent device operate in a timely function may not be optimal, so we cant take the risk of energizing anything accidentally. Photo 1. of vertical rise for every 12 in. The grounded conductor (neutral) of a branch circuit is most commonly identified by the color? Not be installed under an opening through which materials might pass [225.19(D)(3)]. (Window AC Amps), How Many Amps Can 18 Gauge Wire Handle? In your feeder/service load calculation . IAEI News Magazine. Yes, theres no problem with doing this if your specific setup has no other choice but to settle for it , Extension cords can provide power to appliances when outlets are too far away. Match the individual dwelling unit appliance loads for the correct service or feeder volt-ampere loads. They shall not be applied in determining the number of branch circuits for general illumination. Most of this is not out of the ordinary, so we will move on to 225.10 where we have a list of wiring methods which shall be permitted for circuits not over 600 volts on the outside surfaces of buildings. Outside branch circuits and feeders ________ be installed beneath openings through which materials may be moved and shall not be installed where they will obstruct entrance to these buildings\' openings. Minimum size You can use conductors 10 AWG or larger for overhead spans up to 50 ft. For spans more than 50 ft, use 8 AWG or larger (unless supported by a messenger wire) [225.6 (A) (1)], as shown in Fig. (Also, your indentation is wrong, and there is no such thing as end in python. 225. It goes further and even tells us how the messenger is to be supported, that being strain insulator devices. With this in mind and to reduce repetition, I will only touch on the unique issues here and we will cover the rest of the basics in our next article. How Long Does a Ballast Last? Outdoor conductors are subject to stresses that indoor conductors arent. Moving on to the general requirements, the first item is the requirement for conductor covering, which is required within 10 of any building or structure other than supporting poles. A 4 AWG copper conductor is ___ than a 8 AWG copper conductor? Average Ballast Life Span, The Best Soldering Guns for Any Type of Job, The Best Soldering Stations for Any Soldering Works, How Do Electrical Panels Work? Only the most important condition, in my thoughts, and that is the area over public streets, alleys, and roads subject to truck traffic; driveways other than residential; and other land traversed by vehicles such as cultivated, grazing, forest and orchard. 220. To give you a brief idea, , Ive met many people who put no thought into the conduits they will use for their wiring and electrical projects. This process is automatic. Even 220 volt appliances , Different car amplifier ratings require different voltages with specific wire sizes to achieve the finest sound quality possible. Total lighting load = 48,000 + 3,000 + 1,500 = 52,500 VA, Table 220.42, Demand factors for dwelling units, First 3,000 at 100% = 3,000 VA = 3,000, Balance at 35% = 49,500 35% = 17,325. Conductors of over 1000 volts, nominal, shall comply with the spacings provided in. Table of Contents Show 225.1 Scope. It has a gun shape design and a pistol grip that gives me , Whether youre a pro or just a casual hobbyist, investing in your work by having the best soldering station for electronics, DIY repairs, and the like makes a lot of , Having the best soldering iron for electronics makes a world of difference to both professionals and hobbyists alike. Over 600 volts requires a minimum of 6 AWG copper, or 4 AWG aluminum, individual conductors; if using a cable assembly, the limits go down to 8 AWG copper or 6 AWG aluminum. Photo 3. At Last Significant Progress in a PV Standard, Basic three-phase power measurements explained, IAEI News Live: Feeder Installation Review, Keeping Residential Swimming Pools Safer Through Regular Electrical Inspection and Maintenance, Electrical Equipment Evaluation & Equipment Move. Related: GFCI Receptaclevs GFCI Circuit Breaker What is the Difference? Exception No. The feeder demand (line) load for a 5.5 kW, 120/240-volt electric dryer in a dwelling unit is 5,500 volt-amperes. But if building management provides electrical maintenance under continuous supervision, management can make access available only to building management [225.35 Ex]. What Gauge Extension Cord For Refrigerator & Other Devices. The circuit conductors between the final overcurrent device protecting the circuit and the outlet (s). The demand factors specified in Table 220.42 shall apply to that portion of the total branch-circuit load calculated for general illumination. The customer has decided to use the minimum size service. Overhead conductors must maintain a clearance of at least 3 ft from: Signs, chimneys, radio and television antennas, tanks, and other nonbuilding or nonbridge structures [225.19(B)]. Randy Hunter is an instructor and consultant specializing in electrical code and installations, and co-owner of Hunter Technical Services. For all other installations, the feeder or branch circuit disconnecting means must have a rating of at least 60A [225.39(D)]. These may be providing power to detached buildings, wells, signs, area lighting, or other exterior equipment. A lot of houses do not need feeders, especially if their main panels can handle all their loads accordingly. While we can utilize hammers and other essential , Electrical panels are integral components of every building. When that tenant does not have access to the feeder overcurrent device, the code requires that branch-circuit overcurrent devices shall be installed on the load side of the feeder, that they shall be readily accessible, and a key point here they shall be sized smaller than the feeder overcurrent device. www.ecmweb.com is using a security service for protection against online attacks. If youre wondering what gauge wire for 1200 watt amp, the answer , Youre trying to plug in your refrigerator, but the outlet is farther than you thought. Informational Note: For additional information on wiring over 1000 volts, see ANSI/IEEE C2-2017, Application of other articles, including additional requirements to specific cases of, Where within 3.0 m (10 ft) of any building or structure other than supporting poles or towers, open individual (aerial) overhead conductors shall be insulated for the, 225.5 Size of Conductors 1000 Volts, Nominal, or Less. Again, I challenge you to open the code and review the actual code language. Its easy to overlook a detail in Art. Calculate the line lighting feeder demand for a 16,000-square-foot dwelling unit, including small-appliance and laundry loads. 220.14 Other Loads All Occupancies (J) Dwelling Occupancies Units. Cara screenshot panjang samsung a10 memang sangat lah mudah, samsung a10 merupakan smartphone yang bisa dikategorikan smartphone untuk kalangan entry level. Generally, in estimating terms, branch is smaller conduit and wire. 4) For a pole or similar structure used only for the support of signs installed in accordance with Art. The most obvious location mentioned is a barn loft through which things are loaded. For 600 volts or less, we are allowed to use 10 AWG copper or 8 AWG aluminum for spans up to 50 feet, and for spans over 50 feet you are required to step up one size to 8 AWG copper, or 6 AWG aluminum. This is very commonly violated. Those supports in the center of a run have equal tension pulling in two directions, so they basically just need vertical strength; however, the end supports have the pull in just one direction, and therefore have to be strong enough for the lateral pull in one direction. Branch circuits are those conductors that connect from the subpanel to the receptacle, where our subpanel serves as the final overcurrent device. Branch circuits and feeder circuits have other differences. 4 Monats vor. Still, generally, the difference lies in the actual thickness of the wires needed and the way to determine the wire thickness. For a one-family dwelling, the feeder disconnecting means must have a rating of at least 100A, 3-wire [225.39(C)]. If the point of attachment is on the side of the building below the roof, the 3 ft clearance from the roof edge doesnt apply [225.19(A) Ex 4]. The minimum lighting load shall be determined using the minimum unit load and the floor area as determined in 220.11 for dwelling occupancies. So if what you have is 2 buildings that are separated by a fire wall the Part II of Article 225 would apply and the building could only be served by a single feeder. (See 225.30) Follow all rules for the installation of disconnects. These are: Systems designed for connection to multiple sources of supply for the purpose of enhanced reliability. First, let's define branch. Total service or feeder demand for these three appliances after appliance demand factor is applied. If you are familiar with Article 230 (or have been cheating and reading ahead), you will notice that just about every item in this section is also covered in 230. rating or less are included in the general unit load calculation of 220.14(J). All Courses FREE to Take - Pay only for the Certificate Record Dismiss, 110 Requirements for Electrical Installations, 200 Use and Identification of Grounded Conductors, 220 Branch-Circuit, Feeder, and Service Load Calculations, 225 Outside Branch Circuits and Feeders, 300 General Requirements for Wiring Methods and Materials, 311 Medium Voltage Conductors and Cable, 312 Cabinets, Cutout Boxes, and Meter Socket Enclosure, 314 Outlet, Device, Pull and Junction Boxes; Conduit Bodies; Fitting; and Handhole Enclosures. How many 120-volt, 15-ampere lighting circuits are required for a dwelling unit with a calculated lighting load of 16,000 volt-amperes? The service requires full cookie support in order to view this website. Automatic means to take action to reduce the connected load shall be permitted. . How to Test an Electronic Ballast with a Digital Multimeter? A building or other structure that is served by a, Article 225 Wiring and Protection, Outside Branch Circuits and Feeders, (2) Special Occupancies, Outside Branch Circuits and Feeders, 225.39 Wiring and Protection, Rating of Disconnect, 225.37 Wiring and Protection, Identification, Where a building or structure has any combination of, National Electrical Code 2020 of Illinois, National Electrical Code 2017 of Illinois, 555 Marinas, Boatyards, and Commercial and Noncommercial Docking Facilities, Community antenna television and radio distribution systems, Electrically driven or controlled irrigation machines, Fixed outdoor electric deicing and snow-melting, Hazardous (classified) locations specific, Swimming pools, fountains, and similar installations, For 1000 volts, nominal, or less, 10 AWG copper or 8 AWG aluminum for spans up to 15 m (50 ft) in length, and 8 AWG copper or 6 AWG aluminum for a longer span unless supported by a messenger, For over 1000 volts, nominal, 6 AWG copper or 4 AWG aluminum where open individual conductors, and 8 AWG copper or 6 AWG aluminum where in, Liquidtight flexible metal conduit (LFMC), Liquidtight flexible nonmetallic conduit (LFNC), Reinforced thermosetting resin conduit (RTRC), Power conductors below communications conductors 750 mm (30 in.). Branch circuits use from 14-gauge to 6-gauge wire. 4: The requirement for maintaining the vertical clearance 900 mm (3 ft) from the edge of the roof shall not apply to the final conductor span where the conductors are attached to the side of a building. To minimize the possibility of accidental interruption of critical power systems, the disconnecting means for a fire pump or for standby power must be located remotely away from the normal power disconnect [225.34(B)]. True or False. Dengan spesifikasi yang lumayan mumpuni 5 Tips Mengatasi Bau Kolam Lele Budidaya lele merupakan salah satu budidaya yang diminati banyak orang. For the branch circuit vs feeder, you can run them in the same raceway. The minimum lighting load shall be determined using the minimum unit load and the floor area as determined in 220.11 for dwelling occupancies. Well, the code doesnt allow twenty branch circuits to be fed back to the main building for this application. In order to understand the difference between the two, we need to establish where the service point is located. (E) Different Characteristics. This may sound totally confusing, but here is an example: the main building has the normal power service, and therefore has a feeder out to the parking garage, and this feeder goes to a panelboard which feeds all the normal lighting circuits. Its an easy processjust use an amperage capacity table or manually check the , Can you put a GFCI outlet on an AFCI circuit? First, the overhead spans would be wiring going from building to building or pole to pole, usually contained within the confines of ones property. Please enter your credentials below! Indoor garden setups , Do you have a problem with your ballast? When you make a purchase using links on our site, we may earn an affiliate commission. Then repeat with support requirements and disconnect rules. Automatic means to take action to reduce the connected load shall be permitted. My house does not have a subpanel. The installation of outside wiring on surfaces of buildings (or other structures) shall be permitted for circuits not exceeding 1000 volts, nominal, as the following: Circuits of over 1000 volts, nominal, shall be installed as provided in, 225.11 Feeder and Branch-Circuit Conductors Entering, Exiting, or Attached to Buildings or Structures, Open conductors shall be supported on knobs, racks, brackets, or strain insulators, that are made of glass, porcelain, or other. 3. Another thing to consider is that due to condensation, various wiring methods run outside of buildings are subject to moisture inside conduits, as well as underground installations. Starting out with the lowest clearance, which is 10 feet, this is the minimum clearance for conductors operating at 150 volts or less to ground and subject only to pedestrian traffic. Maintain clearances. Sections 225.7 and 225.8 deal with Lighting Equipment Installed Outdoors and Calculations of Loads 600 Volts, Nominal, or Less. Still, feeder lines in houses are rare, and they might be mistaken for an electrical branch circuit. Chase volunteers at an animal shelter after school, feeding and playing with the cats. How Many Christmas Lights Can You String Together? In this case, the breaker (not the pushbutton) is the disconnecting means. Before you go, please take a look at our comparison article: I am Edwin Jones, in charge of designing content for Galvinpower. 10 ft above finished grade, sidewalks, platforms, or projections from which they might be accessible to pedestrians for 120V, 120/208V, 120/240V, or 240V circuits [225.18(1)]. Kolam lelePosted by FisTx Indonesia on Thursday, January 7, 2021 Bau kolam lele bisa Telset.id, Jakarta YouTube tidak hanya menjadi platform untuk berbagi video saja. Thus, to know the right feeder line, the branch circuit ratings that tap into the feeder line must be identified first. 220.51, use 100% (Exception does not apply). Exception No. As with many sections of the code, the general rule is followed by several exceptions; and in this case, we have four. Galvinpower.org is a participant in the Amazon Services LLC Associates Program, an affiliate advertising program designed to provide a means for sites to earn advertising fees by advertising and linking to Amazon.com. Depending on the type of x, y and z you may have to be careful to store a copy into the tuple. Please enable JavaScript on your browser and try again. NEC Reference. The main panel serves as the source, while the subpanel is the final overcurrent device. The disconnecting means for a building supplied by a feeder must plainly indicate whether its in the open or closed position [225.38(D)]. Many good soldering iron kits now come with a complete set of , As a master electrician, Ive worked on many projects that require me to bend electrical conduit pipes at a rather odd shape. To avoid that, check your design to ensure youre meeting these three goals: 1. They protect our homes against dangers like fire and electrocution. Electrical Exam Academy Study Guide. What Size Wire for 200 Amp Service? a. Article 100, The circuit conductors between the final overcurrent device protecting the circuit and the outlet(s). 225. Once this point is found, then anything that is both outside and downstream of the service disconnect would come under the scope of this article. It makes it easier for developers to use the tools required to create any Application Biasanya sewaktu kita menggunakan laptop dan pc, pasti tidak seru rasanya kalau kita tidak memutar sebuah lagu di laptop atau pc, apalagi kamu tipe orang yang hobi mendengarkan musik pastinya kalau Hormon progesteron bertugas merelaksasi otot-otot halus di seluruh tubuh, begitu juga di bagian saluran pencernaan. NEC Reference? As an Amazon Associate I earn from qualifying purchases. For overhead conductors above pools, outdoor spas, outdoor hot tubs, diving structures, observation stands, towers, or platforms, follow the clearance requirements in 680.8. 2. Additional supplies are permitted where documented safe switching procedures are established and maintained for disconnection [225.30(E)]. over track rails of railroads, Horizontal clearances from buildings cannot be less than ? of the continuous load where a feeder supplies a continuous load. Please enable cookies on your browser and try again. (C) Special Occupancies. In 225.30 Number of Supplies, we are informed that only one feeder or branch circuit may supply a building, and of course there are exceptions. Requirements for Electrical Installations. In Exception 2, where the roof has a pitch of 4 inches of elevation change in 12 inches of horizontal distance, which makes it quite steep and therefore un-walkable, the clearance may be reduced to 3 feet. What is the calculated load for the general lighting of a 24,000-square-foot one-family dwelling? When the slope of the roof meets or exceeds 4 in. My first question when reviewing this list is, whats not there? The GFCI as well as other fuses in equipment are simply additional protective devices meant to protect users and equipment. The disconnecting means can consist of a manual switch or a power-operated switch or circuit breaker capable of being operated manually [225.38(A)]. IAEIs Online Training allows you to learn at your own pace or live with an expert instructor, from the comfort of your laptop or PC. Performing equipment evaluations, particularly equipment that has been moved from one facility to another facility, is critical to the early success of a project. For installations consisting of a single branch circuit, the disconnecting means must have a rating of at least 15A [225.39(A)]. Anyone with enough time and motivation can learn how to install a subpanel in garage. A GFCI-type receptacle is NOT permitted to be used to replace a two wire ungrounded type receptacle. I recommend a heavy , It may be ironic to know how a global pandemic has drifted our minds to productive horticulture opportunities rather than exposing ourselves to dangers outside our homes. This shows a medical office building where the main service is in the building on the right and the emergency power system and generator are in the parking garage to the left (see inset photo). Its very important to be aware of how the code works and the interaction between various parts of the code. By now we should be used to bouncing from article to article to complete an installation. 5. If he can make 5 servings of cat food from a third of a kilogram of food, how much does one serving weigh? When teaching in a classroom style location, it is actually quite fun to play the game of asking where in the code do we go for this and that as we work through installation scenarios. 220.5. The service requires full cookie support in order to view this website. The service requires full JavaScript support in order to view this website. A continuous load is one where the maximum current is expected to continue for ___ hours or longer? How many other articles apply to Article 225? The more I deal with the code the more I find it important to locate the exact language to ensure I am using that portion of the code exactly as written and not just how I remembered it. It can't serve any other outlet(s), such as lighting, and can serve only receptacle outlets in the laundry area [210.52(F) and 210.11(C)(2)]. Feeders any conductors downstream of the main service disconnect is considered a feeder (to the last set of overcurrent devices). . Which of the following is not covered under the scope of Article 225? Just remember to consult a certified electrician for the project or hire an electrician to do the job for you. If the disconnecting means consists of more than one switch or circuit breaker, the combined ratings must be no less than the calculated load as determined per Art. The most critical issue, in my eyes, is the clearance for overhead conductors and cables, which is dealt with in 225.18. Vegetation such as trees shall not be used for support of overhead conductor spans. This has created the need for theNECto include rules for these substations, as they are part of the system past the point of service and therefore under the scope of theNEC. My receptacle has GFCI on it. Ansichten: 157. shall not Raceways on exteriors of buildings or other structures shall be arranged to drain and shall be _____ for use in wet locations. Complete Answer, How Long Can a 220 Volt Extension Cord Be? Indeed, those are fundamental questions since there are many things to consider when buying , Using the best soldering gun is much easier, safer, and comfortable than using a pen-type soldering iron. For dwelling units, the calculated floor area shall not include open porches, garages, or unused or unfinished spaces not adaptable for future use. Conductors of 1000 volts, nominal, or less, shall comply with the spacings provided in Table 230.51(C). Total feeder demand for these four appliances after appliance demand factor is applied. As these seasons would come around, I would remind the inspectors to review 225.6(B), to freshen their memory, and hopefully cut down the number of phone calls I would get. There must be a voltage between the ungrounded conductors and an equal difference of voltage from each ungrounded conductor to the common neutral conductor The code classification of a branch circuit is generally made according to the ___? Overhead conductors must maintain a vertical clearance of 8 ft above the surface of a roof. 1: Where the building is designed and constructed to comply with an energy code adopted by the local authority, the lighting load shall be permitted to be calculated at using the unit values specified in the energy code where the following conditions are met:(1) A power monitoring system is installed that will provide continuous information regarding the total general lighting load of the building. Conductors in raceways or cables except MI must have thermoplastic or rubber insulation. Calculate each load and determine which single load will be used for the feeder demand. This brings us to Part II of Article 225, which is Buildings or Other Structures Supplied by a Feeder(s) or Branch Circuits(s). How Many Watts is 10 Amps? 2. 225.4 Conductor Covering Conductors must be insulated or covered within 3 m (10 ft.) of a building. Here is the service point for the overhead conductors in photo 1. How many parts is Article 230 divided into. Calculating loads for outdoor installations. 3) For towers or poles used as lighting standards, the disconnecting means is permitted to be located elsewhere on the premises [225.32 Ex 3]. He holds ten inspections certifications from IAEI and ICC. The NEC calculation of 3.0 watts per square foot for dwelling units was moved from Table 220.12 to 220.14(J) and reference to Table 220.12 was removed from 220.14(J). 2. While substations are normally under the control of utilities, in some instances customers are supplied with power at higher than normal voltages from the utility and therefore own their own substations. Motors rated less than 18 hp and connected to a lighting circuit shall be considered part of the minimum lighting load. identified (as applied to equipment art 100. Feeders supplying 15- and 20-ampere receptacle branch circuits shall be permitted to be protected by a ground-fault circuit interrupter installed in a readily accessible location in lieu of the provisions for such interrupters as specified in 210.8 and 590.6(A). Underground raceways (used or unused) entering structures must be sealed in accordance with 300.5(G) to prevent moisture from contacting energized live parts [225.27]. All household electric cooking equipment that is fastened in place (not just an electric range) has been added to the list of appliances that cannot be included in the four or more appliances eligible for a 75% derating demand factor. Choose topics from a full list of courses covering electrical topics that cover what you need to know from the NEC and other electrical codes and standards. Rating or setting of the branch circuit overcurrent protection device. A similar requirement was covered in a previous article, but I think it is important to mention that any underground raceway entering a building shall be sealed. NEC reference: 210.3. I aspire to use my experiences in marketing to create reliable and necessary information to help our readers. Calculations. So now youre wondering what gauge extension cord you can use. Using Type THWN copper for the service conductors, determine the proper conductor size for a new 175-ampere dwelling unit with a single-phase service. Does my electrical system still have a feeder? Lesson 33 Homework 5 4 Lesson 33: Create story contexts for numerical expressions and tape diagrams, and solve word problems.

Michael Ellison Spandau Ballet, Articles L

Comments are closed.

About FineWhine.com

The Whiner is finally going public, after decades of annoying, aggravating and trying the patience of friends and family. The Whiner’s background is in media, business and the internet, so his Whines often focus on stupid or incomprehensible events in those areas. However, they also focus on the incredible incompetence and obliviousness he encounters in his everyday life.

You may encounter the same level of daily frustration as the Whiner does. However, he doubts it.

In real life, The Whiner does have a name, an MBA, and a consulting business specializing in common sense solutions to media and internet problems. Reach him via tucker & fisher funeral home petersburg, va obituaries – or join him on is kane ratan and manager the brothers or miaa baseball 2022 maryland.

lesson 4 feeders and outside branch circuits and feeders

lesson 4 feeders and outside branch circuits and feeders

What, you think I have nothing better to do than fill every little space the designer put onto the blog? Don't worry, I'll get around to it. And if I don't? I doubt it will matter very much to you or anyone else. So stop reading the sidebar already and go read the posts.

lesson 4 feeders and outside branch circuits and feeders